Solutions

Compact Transmission Solutions for Grid Expansion and Uprating

Generation 2.0 Overhead Transmission Line Solution

Accessibility

Exponentially improving the efficiency of both existing and new power grids, addressing the bottleneck of electricity accessibility

Affordability

Customer side Improved financial statements Significant unit capacity cost reduction

Reliability

Eliminate power outages caused by traditional external insulation

Sustainability

Land-saving, low-carbon, visual appearance, and sustainable

G-2.0 Solution

Greenfield Solution

Greenfield Solution

Compared with traditional solutions, the EMAGE solution enables project-specific optimization of:

Structures
  • Materials
  • Size
  • Performance
Line route
  • Spans
  • Easement width
  • Line length
Social impact
  • Environmental clearing
  • Carbon emissions
  • Visual amenity
  • Heritage outcomes
Unit Capacity Cost TOTEX1 ↓ 45~57%
CAPACITY can DOUBLE while unit capacity cost drops significantly
IMPROVED through life SAFETY and MAINTENANCE performance
Reduced ENVIRONMENTAL impact (and offset requirements)
FASTER EIA2 and permitting, shortening grid build-out
Reduced LAND ACCESS costs and easier SOCIAL PERMITTING

Brownfield Solution - Capacity Uprating

Capacity Uprating

Compared to Traditional Solution

Using Same-diameter HTMS Conductor

Post-upgrade Capacity ≈ 1.7 ~ 1.9× Pre-upgrade capacity

Enlarged-diameter Conductor

Post-upgrade Capacity ≈ 2.1 ~ 2.2× Pre-upgrade capacity

Overall Advantages

  • Project schedule greatly shortened
  • Unit capacity cost significantly reduced
  • Much less land use
  • Significantly improved reliability
  • Significantly lower carbon footprint
  • Easier Social Permitting

Brownfield Solution - Voltage Uprating

Voltage Uprating

Compared to Traditional Solution

Voltage Uprating

Post-upgrade Capacity = 2.5 ~ 3.3× Pre-upgrade capacity

Feasibility of Voltage Uprating

Traditional tower electrical restriction: Phase to ground clearance

EMAGE solution electrical restriction: Phase to phase clearance (CICA replacing of line insulator and steel cross-arm)

Overall Advantages

  • Project schedule significantly shortened
  • Unit capacity cost significantly reduced
  • Much lower land take
  • Reliability greatly improved
  • Carbon footprint significantly reduced
  • Easier Social Permitting